FC

Mercer-class survey ship

NV Dawnward

A forty-year-old Mercer-class survey hull out of the Mars yards that opened a reach. Lightly armed on purpose — one debris laser 'rated for rock and optimism' — because a gun at the mouth of somebody else's sky reads as conquest. A mobile laboratory, a diplomatic habitat, a node-seeder, and the ship whose old receiver mast heard a voice four years before there was a road for it.

Operator
Open Reach Survey
Registry
Open Reach registry, out of Highreach
Series
Wide Sky
Drawn as
SITE base: as refitted at Highreach's third ring for the Sable throat, ~2316 (Rev C) — the whole life carried as dated revisions. PRINT: see printConfiguration (the 2312 Highreach slip).
Sheet 1 General arrangement — profile, looking to port 72.0 m overall · 144 frames at 500 mm
D1 D2 D3 D4 D5 D6 D7 Mast blister — Mast blister (on the mast — not a hull deck) · frames 52–66 · published 1-01 Dorsal companionway head — Mast blister (on the mast — not a hull deck) · frames 66–72 · published 1-02 Forward office (master's day cabin) — Command deck · frames 1–4 · fixed Bridge (the flight deck) — Command deck · frames 4–24 · published 2-01 Chart room / ops room — Command deck · frames 24–32 · published 2-02 Forward lock lobby and muster — Command deck · frames 24–32 · fixed 2-06 Lift trunk — Command deck · frames 32–36 · fixed Forward lock section (stores, racked) — Command deck · frames 32–40 · published 2-11 Ready room — Command deck · frames 32–38 · published 2-03 Oversight annex / ship's office — Command deck · frames 40–46 · fixed 5-04 Forward passage — Command deck · frames 36–58 · published 2-05 Mast base watch station (receiver compartment) — Command deck · frames 58–70 · published 2-07 Maintenance well and mast housing — Command deck · frames 70–78 · published 2-08 Mast shack (2313 refit) — Command deck · frames 78–92 · published 2-09 Lift trunk — Accommodation deck · frames 32–36 · fixed Observation gallery — Accommodation deck · frames 16–28 · published 3-02 Officer's row — Accommodation deck · frames 28–46 · published 3-03 Sick bay — Accommodation deck · frames 28–40 · published 3-04 Crew racks — Accommodation deck · frames 40–60 · fixed 3-05 Berthing — Accommodation deck · frames 46–62 · fixed 3-06 Guest cabins — Accommodation deck · frames 62–70 · fixed 3-12 Phase-floor crawl (the well) — Accommodation deck · frames 70–96 · published 3-10 Comms shack — Survey deck · frames 2–8 · published 3-01 Forward instrument bay — Survey deck · frames 8–18 · published 5-01 Cartography / survey bay (forward) — Survey deck · frames 18–34 · published 5-02 Science bay — Survey deck · frames 34–46 · published 5-03 Survey deck port — Survey deck · frames 34–46 · published 5-09 Survey ring passage — Survey deck · frames 46–58 · published 5-05 Survey bay (aft — the cartographer's bay) — Survey deck · frames 58–78 · published 5-06 Aft access trunk — Survey deck · frames 96–104 · published 3-09 Aft exchanger — Survey deck · frames 120–140 · published 5-08 Lift trunk — Machinery and mess deck · frames 32–36 · fixed Mess — Machinery and mess deck · frames 16–32 · published 4-02 Ladderway and spine passage — Machinery and mess deck · frames 36–54 · published 4-12 Wardroom — Machinery and mess deck · frames 54–64 · published 4-08 Galley (2316 refit) — Machinery and mess deck · frames 66–80 · published 4-03 Boat bay (launch bay / shuttle bay) — Machinery and mess deck · frames 66–80 · published 4-04 Engine-room hatch passage and the nail — Machinery and mess deck · frames 80–86 · published 4-13 Engine room (the drive room; the drive bay) — Machinery and mess deck · frames 86–104 · published 4-05 Workshop — Machinery and mess deck · frames 104–112 · published 4-06 Portside spares locker — Machinery and mess deck · frames 104–112 · published 4-07 Drive space, port — Machinery and mess deck · frames 112–138 · derived 4-09 Drive space, starboard — Machinery and mess deck · frames 112–138 · published 4-10 Scrubber housing — Machinery and mess deck · frames 138–144 · fixed 4-11 Forward hold — Hold deck · frames 6–26 · published 6-01 Lift trunk foot — Hold deck · frames 32–36 · fixed Main hold — Hold deck · frames 26–66 · published 6-02 Port stores bay — Hold deck · frames 66–80 · published 6-03 Pallet racks — Hold deck · frames 66–80 · published 6-04 Aft hold — Hold deck · frames 80–104 · published 6-05 Main run (service run) — Hold deck · frames 104–132 · fixed 6-06 Aft lock (EVA) — Hold deck · frames 132–144 · published 6-07 Forward service trunk — Ventral deck · frames 8–24 · fixed 7-01 Ventral bay — Ventral deck · frames 24–52 · published 7-02 Seed racks and the rail — Ventral deck · frames 52–68 · published 7-03 Ring main run — aft junction — Ventral deck · frames 68–96 · published 7-04 Drive frame and inspection grating — Ventral deck · frames 96–138 · published 7-05 Reaction stores — Ventral deck · frames 138–144 · fixed 7-06 Forward office at the bow — 'the cramped forwardoffice'; the office hatch at the end of the forwardpassage Forward lock — beam mating, ramp at dock, theABOARD/ASHORE watch board, the lift Engineering boundary — 'Anything you touch aft of framesixty, you check the book first'; the yard's clean specgives way to the drive section nobody was allowed totrue; new frames welded to old Mast hinge and housing — pinned and sheeted forcrossings; the maintenance well; the phase-floor crawldrops from here Engine-room hatch – Silva's day-book on its nail (Rev Bonward) Cowlings begin — the aft third; the casing open ineleven sections beneath Scrubber housing (pairing with F140 is the drawing's) Stern comms mast (Rev C, 2316) — 'heavier at the stern' 1 20 40 60 80 100 120 140 FRAME
Sheet 2 Deck plans — 7 decks, looking down 11.4 m maximum beam

The pressurised bubble at the top of the mast spine, three deck heights over the bridge. Drawn as a level so the renderer can place it; the hull ends at 14.6 m.

Mast blister · frames 52–66 · published · The Closing Sky, chapter 11,:81; ch13:41 Mast blister Dorsal companionway head · frames 66–72 · published · The Closing Sky, chapter 11 1 20 40 60 80 100 120 140 PORT STBD
  1. 1-01 Mast blister Fr 52–66 published The Closing Sky, chapter 11,:81; ch13:41

    'the little pressurised bubble at the top of the spine where the survey gear lived, and where, if you killed the lights, the reach came in on every side' (The Closing Sky, chapter 11); 'her head against the cold curve of the blister' (The Closing Sky, chapter 11); 'three decks over their heads' from the bridge (The Closing Sky, chapter 13). Height z 19.4 = command deck 12.2 + 3 × 2.4, derived.

  2. 1-02 Dorsal companionway head Fr 66–72 published The Closing Sky, chapter 11

    'up the dorsal companionway to the mast blister' — the climb begins at the galley end after the card game; it rises through the mast housing (2-08).

Key

  • Command
  • Navigation
  • Survey
  • Science
  • Engineering
  • Propulsion
  • Power
  • Life support
  • Habitation
  • Medical
  • Galley & mess
  • Stores
  • Cargo
  • Access
  • Communications

Grade of every figure on these sheets

  • published Stated in the books. If a drawing disagrees, the drawing is wrong.
  • derived Arithmetic on published facts; the working is given.
  • fixed Canon was silent here and the drawing decided.

Principal figures

Each figure carries its grade: published (the books state it), derived (arithmetic on what they state) or fixed (the sheet's own decision, bounded by what the books rule out).

  • Length overall

    72 m

    derived144 frames @ 500 mm

    Frame 140 carries the scrubber housing (Wide Sky, chapter 25), so the frame run reaches at least 140; 144 closes the stern. Spacing of 500 mm is the value that makes the published internal distances work — see the engine-room hatch check below.

  • Beam

    11.4 m

    fixedspec ruling 2026-08-01

    Bounded above by her survey mast being 'made for a hull twice your beam' (Wide Sky, chapter 2) and by 400 t at seven decks. A slender hull is also why she reads 'smaller than the record makes her' (The Widened Road, chapter 2).

  • Height

    14.6 m

    derivedsix hull decks, floor heights below; §3.1.8

    Hull only. The mast blister is not a hull deck — it rides the mast ~3 deck heights above the command deck ('the mast blister three decks over their heads', The Closing Sky, chapter 13, said on the bridge). Corrected 2026-09-21 from 16.8 m (seven decks).

  • Mass

    400 t

    publishedWide Sky, chapter 9

    'four hundred tonnes of ship falling dark along a line an alien had drawn on a chart with one finger' (Wide Sky, chapter 9). The Closing Sky gives only 'a few hundred tonnes of survey ship' (The Closing Sky, chapter 5). She departed Wide Sky nine tonnes over quota (Wide Sky, chapter 1). Light for a 72 m hull: draw her light — thin riveted plating, the aft third an open drive frame under cowlings, the ventral level a service truss.

  • Hull age

    40 yr at 2312

    publishedWide Sky, chapter 1; The Widened Road, chapter 1

    'forty-year-old array plumbing that somebody had upgraded twice' (Wide Sky, chapter 1); 'forty years of patched-and-repatched' (The Widened Road, chapter 1); the watch board 'had sailed with the ship for forty years' (The Widened Road, chapter 1). Laid down c. 2272 at the Mercer Yards over Mars ('had laid down the Dawnward herself', Wide Sky, chapter 21; 'since she came off the Mars yards', The Closing Sky, chapter 21).

  • Complement

    50 berthed; 7–8 principals on watch (The Closing Sky); 90–100 in crush

    publishedThe Widened Road, chapter 18; The Closing Sky, chapter 5, ch10:61; Wide Sky, chapter 11

    'worth more than the fifty berths she owned' (The Widened Road, chapter 18); 'Berths: ninety souls, a hundred if they're small and the scrubbers behave — and that's a month of air, not a season' (Wide Sky, chapter 11); The Closing Sky names seven at their stations (ch05:115) and Sevrin counts eight ('Six … Two of you missing', ch10:61). Vale's 'a hundred people' (The Widened Road, chapter 11) is a round figure. Three watches: 'engineer's watch, deck watch, survey watch' (Wide Sky, chapter 26).

Systems

Main drive

published

Four-feed drive, two mains rings, eleven casing sections

'three feeds on a four-feed drive' (Wide Sky, chapter 17); feed three is sacrificial through the relief path — 'burned through feed three as he'd rigged her to burn — outward, sacrificial, sparing the core' (Wide Sky, chapter 17); 'The drive lay open to the yard lights in eleven sections.' (Wide Sky, chapter 23); 'the cowlings were off all down the aft third' (Wide Sky, chapter 22). Two mains rings is derived — 'one ring turning' / 'The last ring' (The Closing Sky, chapter 21,:119), 'her rings gone dark' (The Closing Sky, chapter 25) — one per side. Casing sections three and four carry OLD welds, not Ostry damage: 'old welds showed silver where the stress paint had cracked, been painted over, and cracked again … There's two hands in these repairs' (Wide Sky, chapter 23–7).

  • Full-burn sprint ceiling70 minutes then the mast starts working her spine like a crowbar
  • Feed cavitation limit90 seconds at full flow Silva underlined ninety. Twice.
  • Span crossing requirement120 seconds at full flow She has ninety. The gap is the plot.
  • Held at the Weir6 minutes at full flow, cavitating for five of them
  • Sprint doctrineOne run. It is the second run that tears her.
  • Why seventy minutesa heavy mast on the dorsal spine, above the thrust line 'that mast starts working her spine like a crowbar — she's carrying a mast rated for a frame two sizes up' (Wide Sky, chapter 7); 'before the spine starts arguing with the mast' (The Widened Road, chapter 7). A fatigue limit on the spine, not a drive limit — derived.

Wide Sky, chapter 17,:93,:105; ch22:43; ch23:5–7; The Closing Sky, chapter 21,:119; ch25:25

Ring main

published

Seam-coupled ring main, numbered banks

Shutdown order, in the words of the book: 'Mains, ring, dorsal array, the warm breathing hum that lived under every deck plate' (Wide Sky, chapter 9). The drive and the mast share one power budget — 'the reserve good for four mast-hours a day at full gain' (The Widened Road, chapter 15). Boards brown under crossing load — 'The whole port bank dimmed to amber and then to nothing as the crossing's load came up through the deck' (The Closing Sky, chapter 20) — while the relay's old keys keep working (The Closing Sky, chapter 20): the relay is hard-wired.

Wide Sky, chapter 9; The Widened Road, chapter 15; The Closing Sky, chapter 20,:15

Deck field

fixed

Held by the seam tap, on the same budget as everything else

Gravity follows the power state, not the drive state — which is why the field dies in the same breath as the mains and the ring (Wide Sky, chapter 9). Nobody walks during the dark passage: 'Straps creaked when anyone breathed.' (Wide Sky, chapter 9); 'Dawes lay in his straps' (Wide Sky, chapter 9). The draw is steady-state and low-amplitude, the opposite loading profile to a traversal.

author ruling 2026-08-01, as bounded by canon validation

Deep-field receiver mast

published

Dorsal spine, unfolds to full survey spread

'built to count gravel at a thousand kilometres and say which pieces were lying about their mass' (Wide Sky, chapter 19). The ORIGINAL mast: 'forty-year-old array plumbing that somebody had upgraded twice and never quite documented' (Wide Sky, chapter 1); 'rated for a frame two sizes up' (Wide Sky, chapter 7); folds — 'pinned and sheeted' for crossings, unfolded 'to its full survey spread' (Wide Sky, chapter 3,:35); 'craned out whole the day before, tagged for the yard stores' (Wide Sky, chapter 26); 'kept seventeen years past its rating' (The Widened Road, chapter 23), feed horn 'sits proud of the frame' (The Widened Road, chapter 24). The REPLACEMENT (2313): 'the certified array fitted at refit' (The Widened Road, chapter 3), 'cold-floored, and certain of itself' (The Widened Road, chapter 3), 'running her dorsal spine straight as a rule' (The Widened Road, chapter 1), and it 'had inherited the habit along with the fault' (The Widened Road, chapter 16). No frame rating is given for the replacement.

  • Warm-up20 minutes before the floor is honest
  • Power share4 mast-hours a day at full gain
  • The faultreads high on the aft quarter, four years, forty-one entries of 'within tolerance'

Wide Sky, chapter 1; ch03:9,:35; ch07:53; ch19:41; ch26:5; The Widened Road, chapter 1; ch03:11,:29,:37; ch16:47–51; ch23:19; ch24:117

Comms mast

published

Added at the second refit; stern-hung

'a comms mast that could reach both fleets at once' (The Closing Sky, chapter 5), hung at the stern with the new galley — 'heavier at the stern' (The Closing Sky, chapter 5); it carries the dock chime (The Closing Sky, chapter 5). Rev C only; not on the 2312 print.

The Closing Sky, chapter 5,:47,:51

Dorsal debris mount

published

One gun

'The Dawnward owned one gun — a debris laser on the dorsal mount, rated for rock and optimism. It killed the first torpedo at four kilometres.' (Wide Sky, chapter 9); 'our gun over the launch and nowhere else' (Wide Sky, chapter 11); a gun watch (The Widened Road, chapter 14); 'the same one gun she had always carried … Teeth would make her a party.' (The Closing Sky, chapter 5); release at the con (The Closing Sky, chapter 21). Dawes's 'two point-defence mounts' (Wide Sky, chapter 8) is reconciled as one mount with two heads. ⚠ SPOILER: 'It would open that drive throat like a can' (The Closing Sky, chapter 21).

Wide Sky, chapter 8; ch09:53; ch11:117; The Widened Road, chapter 14; The Closing Sky, chapter 5; ch21:59,:61

Environmental plant

published

Whole-ship thermal trim; scrubbers at frame 140

Whole-ship thermal trim through the aft exchanger (Wide Sky, chapter 20); scrubbers at the housing (Wide Sky, chapter 25) and a 'mid-deck scrubber' (The Widened Road, chapter 16); 'a month of air' at a hundred souls (Wide Sky, chapter 11); sick bay re-trimmable to Ostry's mix (The Widened Road, chapter 22). 'The radiator patch is a patch.' (Wide Sky, chapter 11) is the only radiator line — panels are the drawing's, on both flanks F24–60 outboard of the gallery (fixed).

Wide Sky, chapter 11; ch16:109; ch18:9; ch20:59; ch25:73; The Widened Road, chapter 16; ch22:17

Relay station (bridge, aft rail)

published

Old mechanical throw-key board; Earth-pattern glass wired in behind it (2316)

'the old mechanical board — the one with the throw-keys worn smooth by a Nhál thumb over five years' (The Closing Sky, chapter 5); 'Wire the glass in as backup where he can't see it and put the old keys under his thumb where he wants them.' (The Closing Sky, chapter 5); 'the glass panel wired in behind it' (The Closing Sky, chapter 5). Fault-predict on the glass 'flags it eight seconds out' (The Closing Sky, chapter 5); the thumb feels it 'a half-second early' (The Closing Sky, chapter 5). Vael 'fed Wells the drive telemetry by hand each time a board browned out' (The Closing Sky, chapter 21).

The Closing Sky, chapter 5,:17,:21,:37,:61,:115; ch19:5; ch20:15; ch21:53

What was checked

The books state distances aboard this ship. The drawing has to produce the same ones or it is wrong — so it is made to, and the working is shown. These run again on every build; a compartment moved by a metre fails them.

  • “Boat bay to engine-room hatch is three metres” The Widened Road, chapter 9 ('three metres from the engine-room hatch where his day-book still hung on its nail')

    4-04 ends F80; hatch passage 4-13 is [80,86]; hatch at F86. 6 frames × 0.5 m = 3.0 m. Pass.

  • “Galley to the nail is three metres aft, past the engine-room hatch” The Closing Sky, chapter 11 ('Three metres aft, past the engine-room hatch, Silva's day-book still hung on its nail')

    4-03 ends F80; the nail is on the engine-room bulkhead at F86. 6 × 0.5 = 3.0 m, and the hatch lies inside that run. Pass.

  • “Cartography is three decks down inside her from the hull top” The Widened Road, chapter 8 ('Three decks down inside her, Vale was signing sanctioned intervals')

    Hull top 14.6 m; D2 (12.2) → D3 (9.8) → D4 (7.4). Cartography 5-02 is on D4, the third deck down. Pass.

  • “The engine room is below the cartography bay” Wide Sky, chapter 3 ('Silva called up from the drive room'), ch03:37 ('He had come up to the bay in person'); The Widened Road, chapter 7 ('he went below')

    4-05 z 4.8 (D5) < 5-02 z 7.4 (D4). Pass. Corrected 2026-09-21 — the two decks were the other way up.

  • “The wardroom is below the survey deck and below the gallery” The Closing Sky, chapter 17 ('walked down through the ship'), ch17:87 ('went back up through the ship to her boards'); The Widened Road, chapter 14 ('came down from the gallery, stood in the wardroom hatch')

    4-08 z 4.8 < 5-06 z 7.4 < 3-02 z 9.8. Pass.

  • “The mast blister is three decks over the heads of people on the bridge” The Closing Sky, chapter 13,:41,:43 ('the mast blister three decks over their heads' — Rook at the reach board, Wells on the con step)

    1-01 z 19.4 − 2-01 z 12.2 = 7.2 m = 3 × 2.4 m. Pass. The 2026-08-01 check tested the galley and failed the prose.

  • “The forward lock is within sight of the science board and the yoke” The Closing Sky, chapter 21 ('stopped in the lock and looked back once at the science board' / 'looked back at Dawes at the yoke'); ch10:59

    2-06 [24,32] stbd abuts 2-01 [4,24] at F24 on the same deck; the bridge's aft-starboard hatch opens into the lobby. Line of sight across F24. Pass.

  • “The oversight annex is a deck away from the forward instrument bay, and lies between the lock and the annex on the walk aft” The Widened Road, chapter 2 ('it puts a deck between her work and yours'), ch02:81 ('between the lock and the survey annex')

    5-04 on D2 (12.2); 5-01 on D4 (7.4); D3 lies between them. Lock 2-06 [24,32] → annex 5-04 [40,46] aft along D2. Pass.

  • “The comms shack is below the bridge, on cartography's passage” The Widened Road, chapter 17 ('In the shack below'), ch17:81 (ladder); ch03:95 ('Down the passage the comms hatch cycled' from Vale's plate)

    3-01 [2,8] on D4 z 7.4, under the bridge [4,24] on D2; same deck as 5-02 [18,34], 10 frames = 5 m down the passage. Pass.

  • “Bridge to survey bay is the length of the ship: down through the sleeping mess, past the engine room, along the survey ring to her hatch” The Widened Road, chapter 23

    D2 bridge [4,24] → lift/ladderway down to D5 mess [16,32] → aft along the spine passage past the engine-room hatch at F86 → up the ring's aft riser to D4 → survey ring 5-05 → 5-06 hatch at F58–78. Route exists in that order and runs 60+ frames. Pass.

  • “The workshop is aft of the drive casing, off the spine passage” Wide Sky, chapter 25 ('In the drive bay the casing stood open in its eleven sections … Vale went aft past all of it to the workshop'), ch25:65

    4-06 [104,112] > 4-05 [86,104]. Pass.

  • “After 2316 she is heavier at the stern — galley and comms mast both aft” The Closing Sky, chapter 5

    4-03 [66,80] is aft of midships (F72 = 36 m); the comms mast is at F144. The 2312 ration line was at the mess [16,32]. Cooking plant moved ~50 frames aft. Pass.

  • “Fifty berths; a hundred in crush for a month of air” The Widened Road, chapter 18; Wide Sky, chapter 11

    3-03 + 3-05 + 3-06 + 3-12 are drawn for fifty; the two holds [6,26] and [26,66] took fifty-one and the sick bay the medical rolls (Wide Sky, chapter 19; The Widened Road, chapter 22). Pass.

Service history

  1. 2312, Highreach, gate four, 11:40 station time – THE PRINT

    Nine tonnes over quota; mast uncertified ('Master declined final certification; sailed at owner's risk'); the hanging conduit with its yellow job-tag; a ration line off the mess; Silva's day-book in the workshop bench drawer; the shadow-board full; seed racks full; one gun.

  2. 2312, Ostry, the run, the Span (Rev A)

    Aft hold holed through-and-through, three compartments lose atmosphere; drive-room ring coolant line cut, 'two burned'; number-two bank scorched; 'raider gifts in the port trunking'; radiator patch; half the seed stock burned as a decoy; feed two's regulation gone, feed three burned out through the relief path — 'Drive crippled.'; port stores bay opened to space at the Span.

  3. 2312–13, first refit, Highreach (Rev B)

    Casing chalked CONDEMNED; dorsal plating off in sheets; new frames welded to old; the drive section rebuilt with Silva's patch kept — 'Patch stays. Better than spec.'; old receiver mast craned out whole to yard stores; 'the certified array fitted at refit' and a mast shack of twice the floor; the day-book on a bolted shelf and on a nail by the hatch; forward lock section re-racked.

  4. ~2316, second refit, Highreach's third ring (Rev C — SITE base)

    'a better drive'; a new galley 'she had never carried', at the stern; a stern comms mast 'that could reach both fleets at once'; the relay's throw-key board reseated with the glass panel wired in behind it; 'the same one gun she had always carried'. Year not in prose (The Closing Sky ~2317).

  5. ~2316–17, the Sable throat

    ⚠ SPOILER. LOST. A corvette put a full rack into the starboard drive space at nine kilometres; she held the mark on one ring, crew taken off onto a Ferren hull on the beam. 'The last ring reached the end of what Silva's book and Silva's own death had bought it, and let go, and where the Dawnward had held her station there was a hard white bloom and then the plain dark of the throat'.

Compiled from

  • Wide Sky — chapters 01–26 (published, frozen)
  • The Widened Road — chapters 01–26 (built, KDP-packaged)
  • The Closing Sky — chapters 01–26 (built; author editorial pending)